Starting polishing, all lights and labels have been removed, first a clear coat is removed with a citrus based paint remover, then the first pass will be with a random speed buffer with Nuvite "C" compound. The second and third pass will be with a Cyclo dual head random motion buffer using a finer Nuvite compound.
Restoration and repair of your favorite classic vintage campers
Saturday, May 12, 2018
insulation
Finishing up Reflectix insulation installation, took 350-400 sq.ft. , spray adhesive holds it securely in place.
Installing shell
Shell going back on newly painted frame with new 3/4" marine grade plywood subfloor.
Also installed new channel to set upper section into.
Also installed new channel to set upper section into.
Subscribe to:
Posts (Atom)